Koreapuff - Insulated Sandwich Panel



Product

KoriaPuff which services quality, speed, security and innovation to its customers, produces new values by presenting the products and production technologies which were developed by its specialist R&D and staff. KoriaPuff which pays special attention to product development and research development activity which makes plans for new targets by employing qualified and wide personnel in this field, works for maximum efficiency with optimum material and human resource. KoreaPuff which perceives developing new functional products in accordance with the needs of the epoch by considering the demands of the customers as a sectoral responsibility, will continue to be an important players in prefabricated constructions and sector with its wide range of products by sustaining the innovations and investments as before, by following the changes and developments closer together with the fair attendances and technical trips at nearly 40 countries.


Technical Dimension
While EPS choice comes to the agenda for more economical solutions, when rockwool is preferred both non burning effect and high insulation values can be obtained. While the density of EPS which is used as an insulation material can be 16 kg/m³, the density of rockwool can reach 100-110 kg/m³.



Sandwich Panel
Load Bearing System Profacto Technology (Unwelded and Bolt Connection System)
Outer Wall System Neopan Technology (Full Automatic Wall Production)
Outer Surface Pre-Painted Galvanized Steel With Micro Ribbed
Inner Surface Pre-Painted Galvanized Steel With Micro Ribbed
Thickness 60mm / 100mm
Insulation EPS / Rockwool
Inner Wall System Neopan Technology (Full Automatic Wall Production)
Surface Pre-Painted Galvanized Steel With Micro Ribbed
Thickness 60mm / 100mm
Insulation EPS / Rockwool
Roof Suspended Celling Gypsum Plate / Rockwool Plate
Roof Insulation Rolled Glasswool / Rockwool
Roof Coat Natural Trapezoidal Galvanized Steel
Pre-Painted Trapezoidal Galvanized Steel / Sandwich Panel
Door & Window Outer Door Insulated Galvanized Steel / Aluminium
Inner Door MDF Lam Press Panel / American Panel
Windows PVC / Aluminium


Technical Presentation

  • Structure work for the 3000 sq.ft Cabin
  • started on 17.06.2011 & completed on 21.06.2011
  • Paneling work started on 22.06.2011 @ 9.00 am
  • 80% of the job was completed the same day by evening
  • Started work of Internal partitions on 24.06.2011 in the morning @ 9.00
  • Completed the entire cabin along with the Roof by 27.06.2011 in the morning
  • The roof is so sturdy & strong that people are already walking on it


APPLICATION



KOREAPUFF (Cold rooms / Clean room & Puf panels)
Mr. Vishal Jain - +91 9764 785 333
vj@speed-4.com